Through this detailed plan set, you can create a 36" x 96" laser table of your own. Large enough to hold all your equipment with room to spare! Built with common lumber and hardware, and minimal tools, this work table offers durability and simplicity for those seeking a strong and affordable workbench. Watch the full build video on my YouTube channel and in the video embedded below.
- Overall work table dimensions: 36" wide x 96" long x 30" high
- Project plan includes a full color 17-page PDF document with information on: tools needed, material considerations, cut lists, detailed drawings with dimensions, and more!
- Digital download - not a physical product